Contractor guide · 24 November 2026
British Columbia
One-page summary
| Program | Amount | Contractor must be | Who applies | Deadline |
|---|---|---|---|---|
| HRR: electric → HP (BC Hydro/FortisBC/Province) Confirmed. S6S7 | Whole home $4,000; partial $1,500 | Home Performance Contractor Network (HPCN) member verified for heating and cooling | Homeowner (online, after install) | Within 6 months of invoice date |
| CleanBC northern fossil → HP Confirmed. S7 | $6,000 (mini, multi, central tier 2); northern dual-fuel $4,500 | HPCN | Homeowner | 6 months of invoice |
| FortisBC dual fuel (invoices ≥ 15 Oct 2026) Confirmed. S7S8 | $4,000; income-qualified up to $8,000 | Technical Safety BC licensed gas contractor, HPCN member listed for that rebate at install time | Homeowner | 6 months of invoice |
| Energy Savings Program (ESP), income-qualified Confirmed. S9 | Up to $13,000 by income level and fuel | ESP Registered Contractor approved for heat pumps | Registered Contractor submits | Within 6 months of invoice |
Name check: BC has no program called “BC Hydro Program Registered Contractor”. HRR uses the Home Performance Contractor Network (HPCN). ESP uses “Registered Contractor” under the CleanBC Better Homes ESP Registered Contractor Terms and Conditions. Confirmed. S6S9
Detail: HRR electric → heat pump Confirmed. S6S7
- Home:
- Must replace a primary all-electric system (baseboards, radiant, electric forced air).
- Supplemental heat must be electric.
- Replacing an existing HP or adding a head: not eligible.
- Emergency replacement of broken electric systems: not eligible.
- Homes over 1,200 sq ft must install a multi-split or central system.
- Equipment:
- On the rebate-eligible heat pump list, and for whole-home also on the NEEP ccASHP list.
- Variable-speed compressor; single-stage and two-stage are not eligible.
- AHRI reference covering all components.
- HSPF2 (Region IV) ≥ 8.5 and SEER2 ≥ 15.2 (or HSPF ≥ 10 / SEER ≥ 16).
- Rated capacity ≥ 12,000 BTU at 8°C.
- Equipment must be new.
- Partial-home: must serve an open, finished main living space and keep heating to −5°C without resistance heat.
- Paperwork:
- paid-in-full invoice ($0 balance) itemizing equipment and labour, per the BC Hydro sample invoice
- for whole home: heat load calculation summary form + heat load report
- Self-installs not eligible. Rebates can’t exceed the invoiced and paid cost.
- The Aug–Oct 2026 bonus promo is over: applications for Aug 1–Oct 31 installs close 30 Nov 2026. Confirmed. S6
Detail: northern fossil → HP (CleanBC) Confirmed. S7
- Home must be at or north of 100 Mile House (lat 51.628°N) and on BC Hydro electric.
- Primarily heated by PNG gas or propane, tank propane, or oil.
- Proof of fossil system removal is required.
- HP must be sized as the primary heating system, serve a main living area, and be installed per the Heat Pump Best Practices Installation Guide.
Detail: FortisBC dual fuel Confirmed. S7S8
- Must replace an existing gas (or piped-propane) furnace that is the primary heat and ≥15 years old.
- New central ducted HP + new ≥95% gas furnace + connected thermostat.
- Switchover ≤5°C (Lower Mainland/Island) or ≤2°C (Interior/North).
- No existing ASHP.
- Income-qualified (IQ) version: pre-tax household income caps (1 person $51,100 … 7+ $135,100); home ≥10 years old, ≤3,500 sq ft, assessed < $1.2M.
- IQ version cannot be combined with other FortisBC, provincial or federally funded rebates.
Detail: ESP (income-qualified) Confirmed. S9
- Homeowner pre-registers and is approved before any work (“Participants must pre-register and confirm eligibility prior to installing upgrades”).
- Income levels use pre-tax combined income (e.g. 1 person: L1 $51,100 / L2 $63,900 / L3 $102,100).
- Assessed-value caps: L1/L2 ≤ $1.2M; L3 ≤ $1.82M (registrations from 1 Apr 2026).
- Electric → HP: Income Level 1 only, 100% of cost up to $5,000.
- Gas/propane and oil tables go up to $13,000 (central or 3-head, L1).
- Oil homes must remove the tank.
- A CSA-F280-12 heat load may be requested; it is required for some measures.
- All work purchased, supplied and installed by an approved Registered Contractor, who submits within 6 months of the invoice.
- Not confirmed. Not confirmed:
- whether ESP money is paid to the contractor or to the homeowner, and the processing time. The requirements page we read doesn’t state the payee.
- the payment timing for HRR. Ask [email protected].
Sources
- S6: BC Hydro: renovating your heating system
- S7: HRR and CleanBC T&Cs (CX-7879, invoices from 15 Oct 2026)
- S8: FortisBC dual-fuel rebate (income-qualified)
- S9: CleanBC Better Homes ESP requirements
Checked 24 November 2026. Programs change; verify on the official page.
Hearthline is a free, independent referral service. We are not an HVAC installer or company and don't sell or install equipment. Participating contractors may pay us a referral fee when we connect you; this never changes the rebate information we show. Hearthline is not a government program or a utility.